RISE at Point Trotter

7151 104 Avenue SE, Calgary, AB

Iain Ferguson

iain.ferguson@cbre.com
403 750 0803

Luke Hamill

luke.hamill@cbre.com
403 294 5707

Evan Renwick

evan.renwick@cbre.com
403 750 0807

Opportunity

RISE at Point Trotter sets a new standard for best-in-class construction and operational efficiencies while offering the first 28’ clear industrial condo development in the greater Calgary market. Thoughtfully designed by Beedie to accommodate a variety of industrial ownership opportunities, each building is comprised of industry-leading warehouse space ranging from 7,097 SF to 10,599 SF. Each state-of-the-art unit includes dock and drive-in loading, ESFR sprinklers, 200-400 amp power, structural steel mezzanines, elegant window glazing, and more.

RISE to the occasion and take advantage of this rare industrial ownership opportunity at Point Trotter, Calgary’s fastest growing industrial park!

Location Description

Point Trotter Industrial Park is Calgary’s most exciting and rapidly expanding southeast submarket, master-planned by the City of Calgary with transportation and logistics being front of mind. The Park has quickly established itself as a significant distribution hub within the Calgary area and is situated directly adjacent to key transportation nodes offering efficient ingress and egress for its resident businesses. The location boasts immediate access to Glenmore Trail, 52nd Street SE and Stoney Trail ring road, and is just minutes from Deerfoot Trail SE.

Listing Type

- For Sale

Availability

- Now Available

Zoning

- IG - General Industrial

Listing Features

Construction: Pre-cast concrete

Square Footage Range: 6,904 SF – 10,589 SF

Ceiling Height: Building B: 28’ clear Building A: 26’ clear

Dock and/or Grade Loading: Various loading configurations with 8’6”x10’ dock doors and 12’x14’ grade doors

Mezzanine: Structural steel mezzanine complete with guard rail & designed to 100 lbs PSF floor load capacity

Floor Load: 500 lbs/SF live load warehouse floor load capacity

Power: 200 amps at 347/600 volts per bay

Lighting: High efficiency LED fixtures

Sprinkler System: ESFR sprinkler system

Interior Warehouse: A minimum of two 6’x6’ skylights per bay with interior walls painted white for greater illumination

Anticipated Completion: Building B: Q3 2023 Building A: Q1 2024