RISE at Point Trotter
7121 104 Avenue SE & 10300 68 ST SE, Calgary, AB
Iain Ferguson
iain.ferguson@cbre.com
403 750 0803
Luke Hamill
luke.hamill@cbre.com
403 294 5707
Evan Renwick
evan.renwick@cbre.com
403 750 0807
Opportunity
RISE at Point Trotter sets a new standard for best-in-class construction and operational efficiencies while offering the first 28’ clear industrial condo development in the greater Calgary market. Thoughtfully designed by Beedie to accommodate a variety of industrial ownership opportunities, each building is comprised of industry-leading warehouse space ranging from 7,097 SF to 10,599 SF. Each state-of-the-art unit includes dock and drive-in loading, ESFR sprinklers, 200-400 amp power, structural steel mezzanines, elegant window glazing, and more.
RISE to the occasion and take advantage of this rare industrial ownership opportunity at Point Trotter, Calgary’s fastest growing industrial park!
Location Description
Point Trotter Industrial Park is Calgary’s most exciting and rapidly expanding southeast submarket, master-planned by the City of Calgary with transportation and logistics being front of mind. The Park has quickly established itself as a significant distribution hub within the Calgary area and is situated directly adjacent to key transportation nodes offering efficient ingress and egress for its resident businesses. The location boasts immediate access to Glenmore Trail, 52nd Street SE and Stoney Trail ring road, and is just minutes from Deerfoot Trail SE.
Listing Type
- For Sale
Availability
- Now Available
Zoning
- IG - General Industrial
Listing Features
Construction: Pre-cast concrete
Square Footage Range: 6,904 SF – 10,589 SF
Ceiling Height: Building B: 28’ clear Building A: 26’ clear
Dock and/or Grade Loading: Various loading configurations with 8’6”x10’ dock doors and 12’x14’ grade doors
Mezzanine: Structural steel mezzanine complete with guard rail & designed to 100 lbs PSF floor load capacity
Floor Load: 500 lbs/SF live load warehouse floor load capacity
Power: 200 amps at 347/600 volts per bay
Lighting: High efficiency LED fixtures
Sprinkler System: ESFR sprinkler system
Interior Warehouse: A minimum of two 6’x6’ skylights per bay with interior walls painted white for greater illumination
Anticipated Completion: Building B: Q3 2023 Building A: Q1 2024