Port Kells West

9697 & 9779 190th Street, Surrey, BC

Chris Morrison

chris.morrison@colliers.com
604-661-0875

Vito DeCicco

vito.decicco@colliers.com
604-661-0830

Adam Mitchell

adam.mitchell@colliers.com
604-694-7207

Opportunity

Comprised of three state-of-the-art buildings, Port Kells West offers businesses and investors a remarkable opportunity to own brand new industrial warehouse space in Surrey’s most coveted industrial node, Port Kells.

With premium industrial strata units ranging from 6,900 SF – 18,000 SF, the development features best-in-class specifications including structural steel mezzanine, high ceiling heights, dock and grade loading, and more.

With a variety of unit sizes available to suit nearly every type of business, Port Kells West provides everything you need to position your company for success.

Location

Port Kells West is situated in arguably the most sought-after industrial hub in Metro Vancouver. The Port Kells industrial area is instantly accessible from Highway 1 via both 192nd Street and 200th Street interchanges. Golden Ears Way flows east-west along the Fraser River, connecting the area to both the Golden Ears Bridge and the South Fraser Perimeter Road.

Port Kells West is specifically located on the west side of 190th Street, directly north of 96th Avenue — the major connector route through Port Kells and Northwest Langley. Amenities are within walking distance at 200th Street and transit is readily available. This location is considered premium in the Fraser Valley and cannot be beat.

Listing Type

- For Sale

Availability

- Now Available

Zoning

- IL (Light Industrial)

Listing Features

Total Saleable Area: 18,000 SF

Square Footage Range: 6,900 SF to 18,000 SF

Ceiling Height: Bldg A & B – 32′ clear; Bldg C – 24′ clear

Dock and/or Grade Loading: Bldg A & B – dock and grade; Bldg C – grade

Floor Load: Bldg A & B – 700 lbs/SF live load; Bldg C – 500 lbs/SF live load

Power: Bldg A & B: 1,600 amps at 347/600 volt; Bldg C: 1,200 at 347/600 volts dedicated service to the building

Lighting: High efficiency LED fixtures

Heating: Gas-fired unit heaters

Recirculation Fans: Ceiling fans located near loading doors

Sprinkler System: ESFR sprinkler system

Skylights: Warehouse skylights

Completion Date: Q2 2023