Citi Block By Beedie
7755 Birchmount Road, Markham, ON
Newton Leung
newton.leung@colliers.com
416 318 8056
Christian Mazzanti
christian.mazzanti@colliers.com
416 910 7343
Thomas Cattana
thomas.cattana@colliers.com
416 620 2863
Gord Cook
gord.cook@colliers.com
416 726 8525
Opportunity
Located within walking distance to Downtown Markham, Citi Block offers an exceptional opportunity for occupiers and investors to purchase efficient and functional warehouse space, architecturally designed with modern curb appeal. Each industrial condo unit at Citi Block is equipped with premium finishes and offers two loading docks and one drive-in door for quick shipping, soaring 32’ clear ceilings to maximize racking capacities and pre-built structural steel mezzanines for additional office or storage needs. Offering exceptional exposure along Birchmount Road, opportunities at Citi Block start from 15,257 SF, with the option to acquire contiguous units up to 61,262 SF.
Location Description
Situated at the corner of Birchmount Road and Citizen Court, this rare opportunity is located just minutes from Highway 404 and Highway 407 for unparalleled connectivity to the rest of the Greater Toronto Area and its diverse employment force. This growing multicultural neighbourhood is surrounded by restaurants, coffee shops, fitness centres, banks, movie theatres, hotels, and endless local amenities, making it ideally located for employees and customers alike.
Listing Type
- For Sale
Availability
- Now Available
Listing Features
Construction: Insulated concrete pre-cast
Total Saleable Area: 92,491 SF
Square Footage Range: 15,257 SF to 61,262 SF
Ceiling Height: 32′ clear
Dock and/or Grade Loading: Two (2) dock, one (1) grade per unit
Second Floor: Concrete, complete with guard rail & 100 lbs/SF floor load capacity
Floor Load: 700 lbs/SF warehouse floor load capacity
Power: Building: 1,200 amps at 600/347 volts; Each Unit: 200 amps at 600/347 volts
Lighting: High efficiency LED
Sprinkler System: ESFR sprinkler system
Parking: Ample on site vehicle parking and truck maneuvering room
Completion Date: Q3 2024