Opportunity

Apex at Eastlake (Apex) offers small to mid-size businesses in southeast Calgary the opportunity to own their real estate and build equity through their companies. This class “A” industrial condo development showcases high-quality base building specifications, turn-key construction options, and multiple loading configurations, which extends across two buildings. Building A is now fully subscribed, while Building B is available immediately. Flexibility abounds in this latest Beedie offering, with Building B unit sizes ranging from 7,340 SF up to 37,126 SF, including mezzanine.

Location Description

Apex at Eastlake is located along the north-south corridor of 52nd Street SE, a main artery, which connects the development with Glenmore Trail to the north, and 114th Avenue SE to the south. Apex is situated moments away from major City of Calgary thoroughfares, such as Deerfoot Trail, Barlow Trail SE, and Stoney Trail.

Nestled within Eastlake, a well-established district with various amenities and City of Calgary transportation routes in place, Apex boasts direct exposure to 52nd Street SE and will see over 21,000 vehicles per day.

Listing Type

- For Sale

Availability

- Now Available

Zoning

- IG - General Industrial

Listing Features

Construction: Pre-cast concrete

Total Saleable Area: Building A: 95,839 SF; Building B: 91,869 SF

Square Footage Range: Building A: Sold Out; Building B: 7,358 SF up to 37,126 SF

Ceiling Height: 26’ clear

Dock and/or Grade Loading: Dock & grade per bay

Mezzanine: Structural steel with concrete floor

Floor Load/Racking Load: 500 lbs/SF warehouse floor load capacity

Power: 200 amps at 347/600 volts per bay

Lighting: High efficiency LED fixtures

Sprinkler System: ESFR fire protection

Skylights: Warehouse skylights, 3 per bay

Parking: Minimum 7 stalls