Apex at Eastlake
11080 - 50th Street SE & 5250 - 110th Avenue SE, Calgary, AB
Josh Magnussen
josh.magnussen@colliers.com
1 403 538 2526
Paul Marsden
paul.marsden@colliers.com
1 403 571 8764
Neil Ferris
neil.ferris@colliers.com
1 403 298 0421
Matt Binfet
matt.binfet@colliers.com
1 403 870 3130
Opportunity
Apex at Eastlake (Apex) offers small to mid-size businesses in southeast Calgary the opportunity to own their real estate and build equity through their companies. This class “A” industrial condo development showcases high-quality base building specifications, turn-key construction options, and multiple loading configurations, which extends across two buildings. Building A is fully subscribed, while Building B is anticipated to deliver Q3 2021. Flexibility abounds in this latest Beedie offering, with unit sizes ranging from 8,820 SF up to 56,340 SF, including mezzanine.
Location Description
Apex at Eastlake is located along the north-south corridor of 52nd Street SE, a main artery, which connects the development with Glenmore Trail to the north, and 114th Avenue SE to the south. Apex is situated moments away from major City of Calgary thoroughfares, such as Deerfoot Trail, Barlow Trail SE, and Stoney Trail.
Nestled within Eastlake, a well-established district with various amenities and City of Calgary transportation routes in place, Apex boasts direct exposure to 52nd Street SE and will see over 21,000 vehicles per day.
Listing Type
- For Sale
Availability
- Now Available
Zoning
- IG - General Industrial
Listing Features
Construction: Pre-cast concrete
Total Saleable Area: Building A: 95,839 SF; Building B: 91,869 SF
Square Footage Range: Building A: Sold Out; Building B: 8,820 SF up to 56,340 SF
Ceiling Height: 26’ clear
Dock and/or Grade Loading: Dock & grade per bay
Mezzanine: Structural steel with concrete floor
Floor Load/Racking Load: 500 lbs/SF warehouse floor load capacity
Power: 200 amps at 347/600 volts per bay
Lighting: High efficiency LED fixtures
Sprinkler System: ESFR fire protection
Skylights: Warehouse skylights, 3 per bay
Parking: Minimum 7 stalls
Completion Date: Building A available now; Building B Q3 2021