Series Business Centre 3

6355 Graybar Road, Richmond, BC

Bruno Fiorvento

bruno.fiorvento@am.jll.com
604 998 6006

Casey Bell

casey.bell@am.jll.com
604 998 6014

Opportunity

Series Business Centre 3 offers businesses the opportunity to purchase high-quality warehouse space in the highly sought-after Richmond industrial market. Series Business Centre 3 is a three-building development situated on 12.82 acres of land. This modern warehouse provides users with the opportunity to purchase up to 152,480 SF with strata unit sizes ranging from 14,250 SF to 16,140 SF, and featuring approximately 32’ ceilings*, dock & grade loading, efficient column spacing, 3-Phase Power, insulated concrete tilt-up construction and ESFR sprinklers. The project is designed and constructed by Beedie, the largest private industrial developer in Western Canada.

*Subject to the upcoming adoption of the City of Richmond’s Industrial Intensification Initiative Bylaw.

Location Description

Series Business Centre 3 is the third of three buildings, situated on Graybar Road in East Richmond. This location affords excellent access to Highway 91, providing quick connections to Highways 99 and 17. The property also allows for easy travel via Westminster Highway. East Richmond is centrally located in the Lower Mainland and is home to many of the city’s most prominent tenants including Kuehne & Nagel, Toyota, T&T Supermarket, Volkswagen, and Ingram Micro.

Listing Type

- For Sale

Availability

- Now Available

Zoning

- IL (Light Industrial)

Listing Features

Construction: Insulated concrete tilt-up panels

Total Saleable Area: 152,480 SF

Square Footage Range: 14,247 SF to 16,136 SF

Ceiling Height: Approximately 32’*

Dock and/or Grade Loading: Dock & grade loading per bay

Mezzanine: Structural steel mezzanine designed to 100 lbs PSF live load

Power: 3-phase power, 200 amp at 347/600 volts per bay

Lighting: High efficiency LED warehouse

Sprinkler System: ESFR sprinkler system

Skylights: Three (3) 6’ x 6’ skylights per bay

Washroom: One (1) in every unit

Parking: Minimum 17 stalls per unit

Completion Date: Summer 2021