Pioneer Business Center

6370 & 6340 S Pioneer Way, Las Vegas, NV

Kevin J. Higgins

kevin.j.higgins@cbre.com
702 369 4944

Garrett Toft

garrett.toft@cbre.com
702 369 4868

Sean Zaher

sean.zaher@cbre.com
702 369 4863

Jake Higgins

jake.higgins@cbre.com
702 369 4844

Opportunity

The wait is over! As the most anticipated industrial condo development to hit the market, Pioneer Business Center offers a unique opportunity to own or lease brand new industry-leading warehouse space within the highly sought-after southwest submarket of Las Vegas. The project consists of two buildings totaling 259,731 SF and features best-in-class-specifications including 28’ – 32’ clear height, dock and grade loading, LED warehouse lighting, 3-phase power, ESFR sprinkler system, and more.

With excellent connectivity to the I-215 & I-15 freeways and close proximity to the Las Vegas Strip, McCarran International Airport, an abundance of nearby amenities as well as the Summerlin master-planned community, this project is ideal for industrial owners. Do not miss the opportunity to own or lease within this premier project.

Location Description

Pioneer Business Center is centrally located with easy access to the Las Vegas Beltway (I-215) and the Las Vegas Freeway (I-15). It’s a quick 10-minute drive to the McCarran International Airport and 20 minutes to downtown.

Listing Type

- For Sale

Availability

- Now Available

Zoning

- M-D (Manufacturing District)

Listing Features

Construction: Tilt-up concrete panels

Total Saleable Area: 261,751 SF

Square Footage Range: 7,695 SF to 137,851 SF, including mezzanine

Ceiling Height: Bldg 1: 28′ clear; Bldg 2: 32′ clear

Dock and/or Grade Loading: Dock and/or grade loading per bay

Mezzanine: Bldg 1: Concrete, complete with guard rail & 125 lbs/SF floor load capacity

Floor Load/Racking Load: Bldg 1: 8,000 lbs/SF warehouse floor load capacity; Bldg 2: 12,000 lbs/SF warehouse floor load capacity

Power: 3,000 amps at 480/277 volt dedicated via a pad mounted transformer

Lighting: Full high-efficiency LED light package

Sprinkler System: ESFR sprinkler system

Completion Date: Q1 2023