Apex at Eastlake

11080 - 50th Street SE & 5250 - 110th Avenue SE, Calgary, AB

Josh Magnussen

josh.magnussen@colliers.com
1 403 538 2526

Paul Marsden

paul.marsden@colliers.com
1 403 571 8764

Neil Ferris

neil.ferris@colliers.com
1 403 298 0421

Matt Binfet

matt.binfet@colliers.com
1 403 215 7253

Opportunity

Apex at Eastlake (Apex) presents a unique opportunity for businesses in southeast Calgary. This class “A” development showcases high-quality base building specifications, turn-key construction options, and flexibility, which extends across two buildings. Building A is available immediately, while Building B is anticipated to deliver Q3 2021. Apex offers small to mid-size businesses the freedom to own their real estate and build equity through their companies.

Location Description

Apex is located along the north-south corridor of 52nd Street SE, a main artery, which connects the development with Glenmore Trail to the north, and 114th Avenue SE to the south. Apex is situated moments away from major City of Calgary thoroughfares, such as Deerfoot Trail, Barlow Trail SE, and Stoney Trail.

Nestled within Eastlake, a well-established district with various amenities and City of Calgary transportation routes in place, Apex boasts direct exposure to 52nd Street SE and will see over 19,000 vehicles per day.

Listing Type

- For Sale

Availability

- Now Available

Zoning

- IG - General Industrial

Listing Features

Construction: Pre-cast concrete

Total Saleable Area: Building A: 95,839 SF; Building B: 91,869 SF

Square Footage Range: Building A: 8,738 SF to 8,760 SF; Building B: 7,358 SF to 10,613 SF

Ceiling Height: 26’ clear

Dock and/or Grade Loading: Dock & grade per bay

Mezzanine: Structural steel with concrete floor

Floor Load/Racking Load: 500 lbs/SF warehouse floor load capacity

Power: 200 amps at 347/600 volts per bay

Lighting: High efficiency LED fixtures

Sprinkler System: ESFR fire protection

Skylights: Warehouse skylights, 3 per bay

Parking: Minimum 7 stalls

Completion Date: Building A available now; Building B Q3 2021